Construction is moving along at Southside Elementary School
View of the commons area from the first floor looking up to a future skylight
Ongoing construction activities
-
Continuing work on the north west section of the building with exterior framing, sheathing, and air/vapor barrier
-
Starting roofing on the south portion
-
Installing window frames on the building’s southside
-
Installing interior metal stud partitions on the second floor
-
Beginning mechanical work on the third floor
-
Continuing main ductwork, piping, and electrical work on all floors
The third-floor interior wall framing progressing on track
For additional information or questions, visit the MMSD construction page.
Did you know?
Construction crews have started assembling a temporary exterior building enclosure, which is necessary to keep the interior of the structure above 55 degrees for construction activities, such as drywall work, to continue on schedule.
The air/vapor barrier has been installed on the south side
Three rooftop HVAC units were set into place this week
The view from the street corner on the west side shows significant exterior activity with framing, sheathing, and setting of the remaining structural steel