Summer 2021 Planned Projects
Allis
- Gym Partition - Remove defunct divider and replace with roll-down curtain
- Main Entrance - Cover gable end and roof with metal
Anana
- Cover Fascia Panels - Replace fascia panels with metal cladding
- Gym Floor - Replace gym floor with cushioned vinyl sport flooring (Koster system)
- LMC Carpet Replacement - Replace carpet/Paint
- Replace T12 lights - Replace fixtures with T12 lamps and ballast in the addition areas with new LED fixtures. T12 parts are no longer made.
- DDC Upgrade - DDC Siebe conversion
Cherokee
- Gym Bleachers - Replace bleachers in main gym
- Gym Floor - Replace gym floor with cushioned vinyl sport flooring
- Gym Demo - Demolition of wall tile, bleachers, flooring, movable partition
- Gym Walls - CMU to be refinished and painted
- Gym Partition - Replace defunct divider with roll-down curtain
- Welcome Center - Create a secure entrance sequence at the main entrance to include accessible route from public way and accessible parking
- Restroom Remodel - Remodel 14 ea School Restrooms
Crestwood
- Gym Floor Replacement - Replace gym floor with Granite Acoustiflor (Includes mastic abatement, Koster System)
- Roof Replacement - Roof Sections R04, R06 & R09
District-Wide
- DDC Upgrade - Transitioning from Legacy to Tridium controllers and upgrading to Tridium in 3 buildings
- Floor Replacement - 30 classrooms
- G5 - Emerson, Lincoln, Leopold, Lowell, Muir, and Nuestro Mundo
- Steam Trap Replacement - Replace steam traps at various sites
Doyle
- Elevator Replacement - Replace existing traction elevator and all associated equipment and go to a hydraulic
Elvehjem
- Welcome Center - Add storefront and hallway access from office
Emerson
- Concrete Stairs (7th street) - Replace 7th St. concrete stairs
- Roof Replacement - Roof Sections R01, 03, 04 & R06
- Restroom Remodel - Remodel 10 ea school restrooms
Hamilton
- Ramp to playground - Redesign and replace the ramp to the playground
- Roof Replacement - Roof Sections 22, 23
- Main Office (MS) Flooring Abate/Replace - Welcome Center flooring replacement
Holtzman
Huegel
- Replace T12 lights - Replace fixtures with T12 lamps and ballast in the addition areas with new LED fixtures. T12 parts are no longer made.
Kennedy
- Boiler Replacement - Replace two obsolete 51 year old Kewanee steam boilers and associated controls- convert to HW boiler system
Lapham
- Pool Renovation - Pool and Locker Room renovation
- Roof Replacement - Roof Sections R02, 03, 05 through 09
- Temperature Control - Convert existing obsolete Siebe DDC control system to Webs DDC
Lowell
- Restroom Remodel - Remodel 8 ea school restrooms
- Exterior Masonry - Tuckpointing and Lintel Repair
Mendota
- Site Improvements Phase 3 - South parking lot and fire lane
Midvale
- Office Ventilation - Install heating/cooling air handler to serve main office suite
- Unit Vent Replacement - Replace remaining pneumatic classroom unit ventilators and controls.
Muir
- Boiler Replacement - Replace boiler #2
- Roof Replacement - Roof Sections R10, 11, 12, 14, 15, & 16
- Temperature Control Convert to Webs DDC system.
Pflaum
- Pave FS Lot/Pflaum Rd. Side - Pave from BS Building along Pflaum to East side border
Sherman/Shabazz
- Feedwater tank - Replace boiler feedwater tank
- Chimney Replacement - Remove and rebuild a shorter chimney (abate, remove exist, rebuild, install liner)
- Roof Replacement - R05,06,07,08,10,11,12,17
Shorewood
- LMC Carpet - Replacement Replace Carpet/Paint
- Gym Floor Replacement - Demo and replace gym flooring
Toki
- LMC Carpet Replacement (Middle School) - Carpet cleaning/Abate/Paint
West
- Spectator Gymnasium Wood floor - Refinish Wooden Spectator floor
Whitehorse
- LMC Remodel - Replace Carpet/Paint/Ceilings/Electrical